Level 3 Commissioning

Commissioning Levels
Also known asCx Level 3L3

Level 3 Commissioning is the pre-functional and start-up stage, where installed equipment is energized, inspected and started safely under controlled conditions. Pre-functional checklists confirm readiness, and initial power-up verifies that individual units operate correctly on their own before they are tested for full functional performance.

Category: Commissioning & Testing  ·  Subcategory: Commissioning Levels  ·  Part of the AIDC Technical Terminology reference.