Issued for Review (IFR) is a drawing or document status indicating the deliverable is released for comment and checking by the client, reviewers or other disciplines, not for construction. In data centers it forms part of the controlled document workflow, capturing review comments that must be resolved before the design advances to tender or construction issue.
Category: Design & Engineering · Subcategory: Engineering Deliverables · Part of the AIDC Technical Terminology reference.
Explore the full glossary
1,650 verified data center terms across 23 categories.