Lag

CPM Logic, Float & Delay Analysis
Also known asLag TimePositive Lag

Lag is a deliberate delay imposed on a schedule relationship, adding waiting time between the predecessor and successor, for example a Finish-to-Start link with a lag to allow concrete to cure before loading. In data-center scheduling lags represent unavoidable process delays such as curing, drying or equipment stabilization; excessive or unexplained lags are flagged in schedule quality checks.

Category: Planning, Scheduling & Project Controls  ·  Subcategory: CPM Logic, Float & Delay Analysis  ·  Part of the AIDC Technical Terminology reference.